请高手看下这样翻可以吗

在***山DING东北方向,已经有简易道路到达标高约250米处,可以以此为剥离工作的开始点,向西南方向推进,剥离山DING废石,废石运输至西北方向的山谷中,逐渐展设4号道路。在此开始进行剥离工作,符合矿山开采顺序的要求,剥离期短。
Summit of *** Mountain, Northeast direction, already has *** access road which can reach about elevation height 250m, here can be used as the start point of exploitation, move Southwest, strip the waste stone on the hilltop, transport the waste stone to the Northwest Valley, gradually pave No.4 Road. Stripping here is in accordance with the requirement of the stoping sequence, the stripping term is short.
-|-
发错位置,请将此贴删掉